 |
plc.myforum.ro PLCs users www.plc.myforum.ro!
|
| View previous topic :: View next topic |
| Author |
Message |
grig100 Member 3


Joined: 01 Jan 2015 Posts: 752
|
Posted: 25/10/2016 19:21 Post subject: Transfer your project to HMI Panel via USB Stick |
|
|
How with the TIA Portal do you transfer your project to your operator panel via a storage medium (USB stick, for example)?
https://support.industry.siemens.com/cs/document/109740696/how-with-the-tia-portal-do-you-transfer-your-project-to-your-operator-panel-via-a-storage-medium- (usb-stick-for-example)-?dti=0&pnid=13613&lc=en-US
With TIA Portal V14 and higher, in addition to the previous transfer options (Ethernet, for example), you can download your project directly to a storage medium (USB stick, SD card). Here the data can be handled via the Windows Explorer so that you can also send it by e-mail, for example.
General
The following files are transferred with the download:
Project
Operating system image
User and recipe data
The following devices support the download from device version V14.0 onwards:
Basic Panel 2nd Generation
Mobile Panel 2nd Generation
Comfort Panel
WinCC Runtime Advanced
Download project to storage medium
1 Connect your storage medium (USB stick, for example) to your Engineering PC.
In the project navigation in the TIA Portal you open the folder "Card Reader/USB Memory > Removable devices".
2 Via the "Add user-defined Card Reader button" you can select a storage path (a folder enabled on the Runtime PC, for example) as target directory.
3 Drag and drop the operator panel to the storage medium.
4 Choose whether you want the user data and recipe data overwritten on the operator panel and whether this setting is to be locked on the operator panel. Click the "Load" button.
Note: Click the operator panel in the "Devices & Networks" editor. Under PROFINET Interface > Ethernet addresses you select whether the IP address and the PROFINET device name from the project or from the device are to be used. You cannot change this setting.
A "Simatic.HMI" folder is created on the storage medium. The data is stored in this folder.
Transfer the project to Comfort / Mobile Panel
1 Connect the storage medium to the operator panel.
2 Open the Control Panel of the operator panel via "Settings".
3 Double-click "Service & Commissioning".
4 Select the "Load Project" tab and click "Next".
5 Select the storage medium and click "Next".
6 Select the project to be transferred and click "Next".
7 As required you set whether the user data and recipe data is to be overwritten and whether the operator panel image is to be transferred.
Start the download via "Load".
Transfer project to Basic Panel
1 Connect the storage medium with the operator panel.
2 Open the Control Panel of the operator panel via "Settings".
3 Click "Service & Commissioning".
4 Click "Project Download".
5 Select the storage medium and click the arrow.
6 Select the project and click the arrow.
7 As required you set whether you want the user data and recipe data overwritten on the operator panel and whether the operator panel image is to be transferred. Click the arrow.
8 Check the settings and start the download with "Accept".
Transfer project to PC
1 Connect the storage medium with the Runtime PC
2 Copy the files to the folder "Simatic.HMI > RT_Projects > Project_name.PCName"
3 Open the WinCC Runtime Loader via "Start > All Programs > Siemens Automation > Runtime Systems > WinCC Runtime Advanced > WinCC Runtime Loader".
Click the "Settings" button.
4 Open or fabricate the path under "Configuration path" in the Windows Explorer.
You can also change the path as you wish.
5 Insert the copied files into that folder. |
|
| Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group Fa-ti si tu propriul forum GRATUIT, pe www.myforum.ro
|